Thursday, 12 November 2020

Filling In a Swimming Pool in South Austin

Austin Swimming Pool Demolition
Our client decided that they were tired of dealing with keeping up their older pool. In Austin, the high heat requires a lot of water to be added to the pool during the summer and the filter has to work overtime to keep the pool clean. In addition to the effort, the expense of the cleaning and upkeep can be more than anticipated.

The first step was to bust out large holes in the concrete bottom of the pool to allow for water drainage. If you do not bust out holes in the bottom of the pool it it can fill up the bowl when you get heavy rains. The water has to have a place to drain out of the bottom.

We hauled in fill materials in construction roll off dumpsters from Rubbish Inc Dumpster Rental. As we add the road base material we water it down and then used a ground compacting machine to compact it as much as possible. About every 2 feet of material we would stop and water it down and compact it. The more you can compact the fill in material and dirt the less compaction you will have in the future as the dirt settles over time.

Austin Demolition Services
712 Congress Ave #927
Austin, TX 78701
(512) 298-4167
https://www.austindemolitionservice.com
https://goo.gl/maps/7t9guTpvs4g77SEDA
Austin Demolition Contractors



The post Filling In a Swimming Pool in South Austin appeared first on Austin Demolition Services.

read more...

No comments:

Post a Comment